[Sep-2022] Updated SAP Application Associate C_TPLM30_67 Exam Questions BUNDLE PACK [Q28-Q51]

Share

[Sep-2022] Updated SAP Application Associate C_TPLM30_67 Exam Questions BUNDLE PACK

Master The SAP Content C_TPLM30_67 EXAM DUMPS WITH GUARANTEED SUCCESS!

NEW QUESTION 28
You customize an order type to release orders immediately upon creation, and you assign the order type to a maintenance item.
How can a user override the automatic release of the order without creating a new order type?
Please choose the correct answer.
Response:

  • A. Select a maintenance planner group and set the Do Not Release Immediately indicator.
  • B. Set the Do Not Release Immediately indicator in planning data for the maintenance item.
  • C. Set the Do Not Release Immediately indicator in the task list header.
  • D. Select a maintenance activity type and set the Do Not Release Immediately indicator.

Answer: B

 

NEW QUESTION 29
Based on the exhibit, a customer is using a Virtual Port Mode configuration. If the cable for Domain 1 on Controller 1 is disconnected during failover testing, will the SC Series array port failover work?

  • A. No, the configuration contains only a single port per domain and will not provide port failover.
  • B. No, port failover only works in Legacy Port Mode.
  • C. Yes, the configuration will provide port failover regardless of domains or mode.
  • D. Yes, the configuration will provide port failover as the system is configured for Virtual Port Mode.

Answer: D

 

NEW QUESTION 30
Based on documented best practices, which options may need to be modified on a server QLogic HBA?

  • A. Enable Target Reset and Login Retry Count
  • B. LUNs Per Target and Port Down Retry Count
  • C. Port Down Retry Count and Enable Target Reset
  • D. Port Down Retry Count and Enable LIP Reset

Answer: C

 

NEW QUESTION 31
In order costing, what is the allocation structure used for?
Please choose the correct answer.
Response:

  • A. To provide a hierarchy structure for posting costs to the general ledger
  • B. To determine the overhead costs that need to be applied to each cost element
  • C. To provide a structure to summarize postings across cost elements
  • D. To determine the cost element for debit to the order and credit from the order

Answer: D

 

NEW QUESTION 32
Which 64-bit server operating systems are compatible with the Dell Storage Manager (DSM) Client?

  • A. Red Hat Enterprise Linux 6, Windows Server 2016, and Windows Server 2008 R2
  • B. Windows Server 2008 R2, Red Hat Enterprise Linux 7, and Windows Server 2012 R2
  • C. Red Hat Enterprise Linux 6, Windows Server 2012 R2, and Windows Server 2008 R2
  • D. Windows Server 2008 R2, Windows Server 2012 R2, and Windows 2016

Answer: B

Explanation:
Explanation/Reference: https://www.dell.com/storagehelp/dellstorageclient/2016R2/en-us/GUID-EC463E3A-BEEA-4B81- BE1D-9F3A55C15C3C.html

 

NEW QUESTION 33
A customer is concerned they are over utilizing their 7K drives. Where can information about the real time I/O usage of individual drives be viewed?

  • A. Charting > Disks > [disk folder] IO Charts
  • B. Hardware > Disks > [disk folder]
  • C. Charting > Disks > [disk folder] > [disk number]
  • D. Hardware > Disks > [disk folder] > [disk number]

Answer: D

 

NEW QUESTION 34
A maintenance technician replaces a defective counter with a new counter.
Before the users can create a standard measuring document for the new counter, what step(s) must they perform?

  • A. Create a special measuring document and set the Counter Replacement indicator.
  • B. Dismantle the old measuring point and create a new measuring point.
  • C. Create a new technical object to represent the new measuring point.
  • D. Create a new measuring point and change the measuring point from which the measurement reading was transferred.

Answer: A

 

NEW QUESTION 35
Which is not the phase of corrective Maintenance
Please choose the correct answer.
Response:

  • A. Control
  • B. Base
  • C. Notification
  • D. Planning

Answer: B

 

NEW QUESTION 36
What do you use to set up a refurbishment order for external refurbishment?

  • A. An order type for external refurbishment and an assignment of a material with split valuation.
  • B. An order type for external refurbishment and a material item with item category External
    Refurbishment.
  • C. An external operation that contains a control key for refurbishment.
  • D. An external operation that contains a subcontracting indicator and a material item with a material provision indicator activated.

Answer: D

 

NEW QUESTION 37
Your customer wants to subdivide the maintenance organization by production responsibility.
What do you use to designate the contact person for coordination between production and plant maintenance?

  • A. Controlling area
  • B. Plant section
  • C. Work center
  • D. Production cost center

Answer: B

 

NEW QUESTION 38
Which of the following control characters is available in the edit mask of the structure indicator?

  • A. D (numeric characters)
  • B. Y (special characters)
  • C. M (alphanumeric characters)
  • D. A (alpha characters)

Answer: D

 

NEW QUESTION 39
For which business requirements must you use serial numbers? (Choose two)

  • A. To have the option to track batches
  • B. To have a future option to track material items as pieces of equipment
  • C. To uniquely identify inventory material items
  • D. To have a future option to track material items as pieces of functional locations

Answer: B,C

 

NEW QUESTION 40
A customer wants to define an order type that includes a notification when the order is created.
Which Customizing step(s) must you perform?

  • A. Assign the notification type to the order type according to plant assignment in Customizing.
  • B. Set the indicator for notification data or order header and assign the notification type to the order type in Customizing.
  • C. Set the Notification indicator for the order type according to plant assignment in Customizing.
  • D. Assign the notification type to the order type in Customizing.

Answer: B

 

NEW QUESTION 41
Which object do you use to assign number ranges for maintenance plans in Customizing?

  • A. Maintenance plan category
  • B. Technical object
  • C. Maintenance item
  • D. Maintenance planner group

Answer: A

 

NEW QUESTION 42
In a refurbishment order for external processing, where can you find information about the defective part after the goods issue has been posted?
Please choose the correct answer.
Response:

  • A. In special stock type O (parts provided to vendor)
  • B. In special stock type F (customer order stock)
  • C. In special stock type R (refurbishment stock), after the return from the service company and a goods receipt posting
  • D. In special stock type B (batch) after the return from the service company and a goods receipt posting

Answer: A

 

NEW QUESTION 43
You are installing an SC8000 array and the customer notices that each of the controllers only have 16 GB of memory. The customer wants to maximize this memory. What is the maximum RAM supported on a single SC8000 controller?

  • A. 32 GB
  • B. 256 GB
  • C. 128 GB
  • D. 64 GB

Answer: D

Explanation:
Explanation/Reference: https://www.dell.com/community/Compellent/I-need-help-doubts-about-controlling-compellent- SC8000/td-p/4222299

 

NEW QUESTION 44
Your customer wants to utilize estimated costs in Plant Maintenance orders.
Which condition does the customer need to be aware of?

  • A. Planned costs overwrite estimated costs after release of the order.
  • B. Planned costs must not exceed the estimated costs.
  • C. Upon release of the order, estimated costs cannot be revised.
  • D. A specific order type in which cost estimates are activated must be used.

Answer: C

 

NEW QUESTION 45
Which of the following steps must you perform to customize priorities for a maintenance order?

  • A. Assign a priority type to a technical object master record.
  • B. Assign a priority type to an order type.
  • C. Assign priorities to order types.
  • D. Assign priorities to technical object master records.

Answer: B

 

NEW QUESTION 46
You want to set up an external refurbishment process through subcontracting, using material requirements planning (MRP)?
Which of the following must you set in the system?

  • A. The Material Provision indicator for special stock in the refurbishment order header.
  • B. The Subcontracting flag in the refurbishment order header.
  • C. The Subcontracting flag for the refurbishment order type.
  • D. The Special Procurement indicator in the material master record.

Answer: D

 

NEW QUESTION 47
How many time-based cycles can you use in a multiple-counter maintenance plan?

  • A. One
  • B. Three
  • C. Two
  • D. Zero

Answer: A

 

NEW QUESTION 48
In a refurbishment order for external processing, where can you find information about the defective part after the goods issue has been posted?

  • A. In special stock type O (parts provided to vendor)
  • B. In special stock type F (customer order stock)
  • C. In special stock type R (refurbishment stock), after the return from the service company and a goods receipt posting
  • D. In special stock type B (batch) after the return from the service company and a goods receipt posting

Answer: A

 

NEW QUESTION 49
Refer to the Exhibit.

A customer has asked you to perform a port failover test to demonstrate system resiliency. What is needed to complete this task?

  • A. Add more cables per switch
  • B. Switch to Virtual Port Mode
  • C. Add more switches per controller
  • D. Switch to Legacy Port Mode

Answer: C

 

NEW QUESTION 50
A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?

  • A. TECO (Technically Completed)
  • B. REL (Released)
  • C. ATCO (All Tasks Completed)
  • D. NOCO (Notification Completed)

Answer: D

 

NEW QUESTION 51
......

Pass SAP C_TPLM30_67 Exam – Experts Are Here To Help You: https://www.braindumpspass.com/SAP/C_TPLM30_67-practice-exam-dumps.html