NEW QUESTION 13
After a selection process you have selected a test management tool that is going be introduced in your organization and used by your test team in a pilot project.
You have already identified the member of your test team who will be the administrator of the tool, since he/she has a significant experience with the administration of test management tools and so he/she is able to make effective and efficient up-front decisions about "how" the tool will be used. You have also developed a training plan for the other members of your test team.
In collaboration with the administrator of the tool you have also devised standard ways of managing, storing and maintaining the tool and its assets including backup/restore procedures.
You have also analyzed standard formats supported by the tool (CSV, XLS, XML, etc.) to export, import and archive all the information managed by the tool itself (requirements, test case specifications, test plans etc.) for compliance with the most important test management tools, in order to minimize the impacts of migrating this information to a new tool that could replace the existing one in the future.
Which of the following phases in the lifecycle of the new tool has NOT been adequately considered in this description?
K2 1 credit

  • A. Evolution
  • B. Acquisition
  • C. Support and maintenance
  • D. Retirement

Answer: A

 

NEW QUESTION 14
Assume you are working on a CAS (Conditional Access System) for Pay-TV that allows the access, selection and transfer of services and media to authorized users. Authorized users can choose their services through different channels: Web Customer Portal, IVR (Interactive Voice Response), Call Centre and SMS. The system uses a Smart Card to receive and decrypt the broadcasted encrypted control words which allow decrypting pay-per-view TV. Every authorized user must have a Smart Card and a Set-Top Box to view the contents.
The following is an excerpt from the product risk analysis document: Both likelihood and impact have been rated on the following scale: (1 - Very low, 2 - Low, 3 - Medium, 4 - High, 5 - Very High).
The required test environment and code have been delivered. All test cases for each identified product risk item have been written and are ready to be executed. The Database used to contain the Smart Cards is empty and so only new Smart Cards can be used during test execution.
A Smart Card can only be activated if it has been previously pre-activated. This means the post-conditions for the execution of the test cases to test the pre-activation of the Smart Card are the pre-conditions for activation of the Smart Card.
Which of the following statements represents the most effective contribution of the stakeholders to the completion of the failure mode analysis table?

K4 3 credits

  • A. The system architect and the chief software engineer should contribute to assess the priority. The expert tester is the only one who should contribute to assess the detection.
  • B. The aircraft pilot and the customer representative should contribute to assess the priority. The chief software engineer, the system architect and the expert tester should contribute to assess the detection.
  • C. The aircraft pilot is the only one qualified to contribute to assess the priority and thus should be assigned this task. The customer representative should contribute to assess the detection.
  • D. The aircraft pilot and the customer representative should contribute to assess the detection. The chief software engineer, the system architect and the expert tester should contribute to assess the priority.

Answer: B

 

NEW QUESTION 15
Test Management
The following chart plots the cumulative number of defects opened against the cumulative number of defects closed during system testing of a software product.

Which of the following statements is true?
Number of correct responses: 1
K2 1 credit

  • A. The chart seems to indicate that the defect management process is not working well
  • B. The chart can be used to reveal test progress problems
  • C. The chart seems to indicate that the defect management process is working well
  • D. The chart indicates that you have plenty of problems left to find

Answer: C

 

NEW QUESTION 16
During the follow-up phase the following conditions are checked:
X1. The code has been completely reviewed
X2. All the identified defects have been correctly fixed and the modified code has been compiled successfully and run through all the static analyzers used by the project without warnings and errors
X3. The modified code is available under the configuration management system with a new version number for the specified CI
If these conditions are fulfilled then the review process terminates.
Which of the following characteristics of a formal review is missing in this description?
K2 1 credit

  • A. Deliverables such as reports, evaluation sheets or other review summary sheets
  • B. Checklists to be used by the reviewers
  • C. Metrics for reporting on the review effectiveness, efficiency, and progress
  • D. Defined entry and exit criteria

Answer: C

Explanation:
Topic 2, Test Management

 

NEW QUESTION 17
You are not confident with the assessment of the risk level and you suspect that it will be possible to find high-priority bugs in low-risk areas.
Furthermore the period for test execution is very short. Your goal is to test all the product risks in a risk-based way, while assuring that each product risk gets at least some amount of testing.

Which of the following answers describes the best test execution schedule in this scenario?
Number of correct responses: 1
K3 2 credits

  • A. T1, T3, T5, T7, T9, T2, T4, T6, T8, T10
  • B. T10, T9, T8, T7, T6, T5, T4, T3, T2, T1
  • C. T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
  • D. T10, T8, T6, T4, T2, T9, T7, T5, T3, T1

Answer: A

 

NEW QUESTION 18
Test Management
Consider the following test strategies:
I. Consultative test strategy
II. Reactive test strategy
III. Analytical test strategy
IV. Process-compliant test strategy
Consider also the following examples of test activities:
1. Prioritize the test cases, based on the results of a FMEA analysis, to ensure early coverage of the most important areas and discovery of the most important defects during test execution
2. Execute usability testing driven by the guidance of a sample of users (external to the test team)
3. Perform exploratory testing sessions throughout the system test phase
4. On an Agile project, execute tests that cover the test conditions identified for each user story of a feature planned for an iteration Which of the following correctly matches each test strategy with an appropriate example?

  • A. I-2; II-3; III-1; IV-4
  • B. I-1; II-2; III-3; IV-4
  • C. I-3; II-2; III-1; IV-4
  • D. I-2; II-3; III-4; IV-1

Answer: A

Explanation:
Section: Test Management

 

NEW QUESTION 19
You can count on well-written requirements, but you can't count on an adequate contribution of the stakeholders to the quality risk analysis. You have to mitigate the insufficient contribution of the stakeholders because the risk-based testing approach shall minimize the product risks. Your test team has one expert tester in security testing.
Which of the following test activities would you expect to be the less important in this context?
K4 3 credits

  • A. Automate all functional and non-functional system tests
  • B. Extract from the defect tracking system of the previous project all the security defects and failures, and classify them to support design and execution of specific tests
  • C. Apply systematic and exploratory testing for integration and system test
  • D. Perform exploratory testing sessions with adequate charters covering security aspects

Answer: A

 

NEW QUESTION 20
The following are the requirements identified as "critical":
REQ-SEL-001. The user shall be able to combine all the three products with all the four durations to define an item to purchase
REQ-SEL-002. The user shall be able to add a maximum of six different items to the shopping cart
REQ-PUR-001. The user shall be able to purchase all the items in the shopping cart using a credit voucher
REQ-PUR-002. The user shall be able to purchase all the items in the shopping cart using the available credit already charged on the smartcard
REQ-PUR-003. The user shall be able to purchase all the items in the shopping cart using all the accepted credit cards (Visa, MasterCard and Great Wall Card)
REG-LOGO-001. The user shall be able to logout (by clicking the logout button) from both the "select" and "purchase" pages going back to the "browse" page (anonymous navigation)
Moreover the following quality risk item has been identified as "critical":
QR-P1. The web customer portal might not be able to provide the expected response time (less than 10 sec) for the purchase transactions under a load of up-to 1000 concurrent users
Test analysis for system testing has just begun and the following test conditions have been identifieD.
TC-SEL-01. Test the combinations of products and durations to define an item to purchase
TC-SEL-02. Test the maximum number of items, which can be added to the shopping cart
TC-PUR-01. Test the purchase of an item
TC-PUR-02. Test the purchase of an item with the credit charged on the smartcard
What is the MINIMUM number of test conditions that must be added to fulfill both the EXCR1 and EXCR2 exit criteria?
K3 2 credits

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 21
Which one of the following metrics to be produced needs traceability between the test cases and each item in a proper test basis?
K2 1 credit

  • A. Trends in the lag time from defect reporting to resolution
  • B. Mean time between failures for the system
  • C. Requirements coverage
  • D. Cumulative number of reported defects versus cumulative number of resolved defects

Answer: C

 

NEW QUESTION 22
You are not confident with the assessment of the risk level and you suspect that it will be possible to find high- priority bugs in low-risk areas.
Furthermore the period for test execution is very short. Your goal is to test all the product risks in a risk-based way, while assuring that each product risk gets at least some amount of testing.

Which of the following answers describes the best test execution schedule in this scenario?

  • A. T1, T3, T5, T7, T9, T2, T4, T6, T8, T10
  • B. T10, T9, T8, T7, T6, T5, T4, T3, T2, T1
  • C. T1, T2, T3, T4, T5, T6, T7, T8, T9, T10
  • D. T10, T8, T6, T4, T2, T9, T7, T5, T3, T1

Answer: A

Explanation:
Section: Testing Process

 

NEW QUESTION 23
A chart showing the trend in the lag time from defect reporting to resolution during system testing is also available. The chart shows that the daily closure period is consistently and significantly above the rolling closure period for a long period of the system testing phase.
Almost all defects found during system testing have been related to the system as a whole, not related to single units or integrations issues. Almost all quality risks have been addressed during the unit and integration testing phase and no residual quality risks were present in the integrated system. This has been confirmed by exploratory testing sessions performed during system testing, targeted at finding defects in these quality risk areas.
Based on the given information only, which one of the following areas would you expect to be considered more in the retrospective meeting in order to be improved?

  • A. The requirements review
  • B. The quality risk analysis process
  • C. The defect management process
  • D. The system design and architecture design reviews

Answer: C

Explanation:
Section: Testing Process

 

NEW QUESTION 24
Which of the following statements represents the most effective contribution of the stakeholders to the completion of the failure mode analysis table?

  • A. The system architect and the chief software engineer should contribute to assess the priority. The expert tester is the only one who should contribute to assess the detection.
  • B. The aircraft pilot and the customer representative should contribute to assess the priority. The chief software engineer, the system architect and the expert tester should contribute to assess the detection.
  • C. The aircraft pilot is the only one qualified to contribute to assess the priority and thus should be assigned this task. The customer representative should contribute to assess the detection.
  • D. The aircraft pilot and the customer representative should contribute to assess the detection. The chief software engineer, the system architect and the expert tester should contribute to assess the priority.

Answer: B

 

NEW QUESTION 25
Testing Process
The following are the exit criteria described in the test plan of a software product:
EX1. The test suite for the product must ensure that at least each quality risk item is covered by at least one test case (a quality risk item can be covered by more test cases).
EX2. All test cases in the test suite must be run during the execution phase.
EX3. Defects are classified into two categories: "C" (critical defect) and "NC" (non-critical defect). No known C defects shall exist in the product at the end of the test execution phase.
Which of the following information is useless when the specified exit criteria is evaluated?

  • A. A list of all the open defects with the associated classification information extracted from the defect tracking system
  • B. A traceability matrix showing the relationships between the product risk items and the test cases
  • C. A chart, showing the trend in the lag time from defect reporting to resolution, extracted from the defect tracking system
  • D. The execution status of all the test cases extracted from the test management tool

Answer: C

Explanation:
Section: Testing Process

 

NEW QUESTION 26
You are managing the system testing for a SOA based system. The integrated system consists of several subsystems:
-
A SOA middleware
-
A CRM (Customer Relationship Management) system
-
A BRM (Billing and Revenue Management) system
-
A SMS (Subscriber Management System) system and you performed a risk analysis based on these subsystems.

At the end of the scheduled period for test execution you produce a first classical report based on the traditional metrics of testing. Test pass/fail status and bug status (open/resolved) That table provides you a distorted picture of the quality risk, because there is no indication of the risk level of the failed tests, the tests not run, or the open bugs. Thus, you produce the following table to solve this distortion issue:
In the table above, where you have introduced the concept of risk weighting, the highest risk test or bug report has a score of 1, while the lowest risk test or bug report has a score of 0.04.
Which of the following subsystems, based on the risk scores of the table, is most risky?
K4 3 credits

  • A. BRM
  • B. CRM
  • C. SMS
  • D. SOA

Answer: B

 

NEW QUESTION 27
Test Management
For which of the following activities would the costs be classified as a cost of detection?
Number of correct responses: 1
K2 1 credit

  • A. Re-running a test case, during the system testing phase, to verify that a fix eliminates a previously found defect
  • B. Training developers to better understand the new features of the coding language they will use on the project
  • C. Fixing field failures
  • D. Writing test specifications according to the test design

Answer: D

 

NEW QUESTION 28
Your test team consists of four members (Mary, Bob, Mark, Dave) with different interpersonal skills.
The following skills assessment spreadsheet shows the characteristics of the team members with respect to a list of interpersonal-skills (for each characteristic only the member with the highest level of that characteristic is indicated and marked with 'X'): On the next project a member of your test team will have to perform some routine tasks requiring collaboration with other teams.

Who in your test team would you expect to be most suitable at doing these tasks?
K4 3 credits

  • A. Mark
  • B. Mary
  • C. Dave
  • D. Bob

Answer: B

 

NEW QUESTION 29
Test Management
Consider an agile team adopting Extreme Programming (XP) with five developers and one tester without any coding experience.
To which of the following activities would you expect the tester will contribute most?
Number of correct responses: 1
K2 1 credit

  • A. Executing unit tests
  • B. Supporting the customer in the execution of acceptance testing
  • C. Planning and executing tests during the integration test phase to detect interface defects
  • D. Developing unit tests

Answer: B

 

NEW QUESTION 30
You are using this skills assessment spreadsheet in order to define a training development plan for your test team.
Your objective is to fill the skill gaps by having at least a team member rated as an expert for each skill identified for the "technical expertise" and "testing skills" sections, and with the ability to train the other team members.
Considering the budget constraints you can send only one person to a training course.

Based only on the given information, which of the following answers would you expect to be the best option to achieve your objective?
Number of correct responses: 1
K4 3 credits

  • A. Send Alex to a performance testing training course
  • B. Send Mark to a test automation training course
  • C. Send Robert to a performance testing training course
  • D. Send John to a performance testing training course

Answer: A

 

NEW QUESTION 31
Improving the Testing Process
Which of the following statements about the TMMi test process improvement model is true?

  • A. In TMMi all the process areas at lower levels must be 75% complete by achieving specific and generic goals in order to claim the higher level
  • B. At TMMi level 1 testing is chaotic without a defined process, and it is often seen as the same as debugging
  • C. TMMi provides an approach for test process improvement such as the IDEAL (Initiating, Diagnosing, Establishing, Acting and Learning) model
  • D. TMMi has a staged architecture for process improvement with seven maturity levels

Answer: B

 

NEW QUESTION 32
Assume that the following test cases have been executed at the end of the first week of test execution: TC-
001, TC-002 and TC-007. All these tests are 'passes'.
What is the MINIMUM number of the remaining test cases that must be successfully executed to fulfill the EX1 exit criteria?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D

Explanation:
Section: Testing Process

 

NEW QUESTION 33
Improving the Testing Process
Which of the following statements about the STEP test process improvement model is true?
Number of correct responses: 1
K2 1 credit

  • A. The STEP model stresses defect detection and demonstration of capability, whereas the defect prevention is a secondary potential goal of testing
  • B. In the STEP model, testware design occurs after coding
  • C. The STEP model assures that the system requirements specification and the test design specification processes don't overlap
  • D. In the STEP model, tests validate the requirements and use cases when they are developed

Answer: D

 

NEW QUESTION 34
The following are the exit criteria described in the test plan of a software product:
EX1. The test suite for the product must ensure that at least each quality risk item is covered by at least one test case (a quality risk item can be covered by more test cases).
EX2. All test cases in the test suite must be run during the execution phase.
EX3. Defects are classified into two categories: "C" (critical defect) and "NC" (non-critical defect). No known C defects shall exist in the product at the end of the test execution phase.
Which of the following information is useless when the specified exit criteria is evaluated?
K2 1 credit

  • A. A list of all the open defects with the associated classification information extracted from the defect tracking system
  • B. A traceability matrix showing the relationships between the product risk items and the test cases
  • C. A chart, showing the trend in the lag time from defect reporting to resolution, extracted from the defect tracking system
  • D. The execution status of all the test cases extracted from the test management tool

Answer: C

 

NEW QUESTION 35
In the next two months some new features will be constantly added to new releases of a project you are working on as Test Manager.
You have identified as one of the main project risks, that the requirements specification will still be incomplete when your team starts the test design and implementation phase.
Some requirements will most likely be completed too late to allow a proper test preparation.
You and your test team have already worked on several similar past projects in the same organization.
Which one of the following options would you expect to be the most effective at mitigating this risk?
K4 3 credits

  • A. Even if there are only few details missing, escalate the risk to the project manager without preparing any tests
  • B. Make reasonable assumptions about the missing details and design lightweight tests that can be easily updated during test execution
  • C. Don't design any test until the test execution starts, then communicate that test execution is blocked due to incomplete requirements
  • D. Don't prepare any test and just run the regression test suite to check that the new features don't introduce regression

Answer: B

 

NEW QUESTION 36
......

Real Exam Questions & Answers - ISQI CTAL-TM_Syll2012 Dump is Ready: https://drive.google.com/open?id=1TLsj0og9GBFpifELh25fG5oR0621Ca6p

Get Latest [Sep-2021] Conduct effective penetration tests using  BraindumpsPass CTAL-TM_Syll2012