
[Full-Version] 2023 New BraindumpsPass OG0-093 PDF Recently Updated Questions
OG0-093 Exam with Guarantee Updated 365 Questions
NEW QUESTION # 139
Which of the following is a technique recommended by TOGAF to help identify and understand requirements?
- A. SWOT Analysis
- B. Business Scenarios
- C. Mind Maps
- D. Gap Analysis
- E. Architecture Maturity Models
Answer: B
Explanation:
Section: Part 2
NEW QUESTION # 140
Scenario
Please read this scenario prior to answering the Question
You are working as a consultant to the Chief Architect at an intelligence and security organization responsible for securing government communications and information systems. These provide real-time, highly secure communication of voice, video, and message data to remote locations around the world. The agency has recently received information from intelligence sources that the current encryption protocols may no longer be secure. In response, a program is underway to upgrade the systems.
The agency has an established Enterprise Architecture (EA) capability based on the TOGAF standard. The Executive Director of the agency is the sponsor of the EA capability.
Since reliable, high-performance, and secure communications are essential to preserving national security, the Executive Director has placed more stringent requirements for the architecture of the upgraded systems. It must be able to provide assurance and verification of specific performance measures on the key services that are most crucial for system operation. Focusing on these service-level details and specific measurements, will allow stricter requirements to be enforced in service contracts. It will also provide a high degree of assurance that necessary performance is being delivered and that notifications will occur if any critical service fails to perform as required.
A portion of the program budget has been allocated to conduct a review of the EA. The scope of the review is to evaluate the processes, content and governance of the EA capability to ensure that the higher target performance and service levels required by the upgraded system can be achieved.
The Chief Architect has noted that the core EA artifacts that have been in use are not able to describe these new capabilities. The artifacts do not have explicit provisions for defining the in-depth measurement requirements regarding specific services required for the system. She has learned that certain services within the current system have service measurement implementations that match some of the new requirements, but they are only used in a few areas.
Recent EA efforts at another national agency have produced generalized high-performance communication system models to realize similar requirements in a critical defense system involving secure communications. It is possible that these models may be useful for the upgrade program.
Refer to the Scenario
[Note: You may need to refer to the Content Metamodel chapter, section 30.4 (located in Part IV) of the reference text in order to answer this question.] You have been asked to make recommendations for tailoring the Architecture Content Metamodel to accommodate the requirements of the upgraded system.
Based on the TOGAF standard, Version 9.2, which of the following is the best answer?
- A. You recommend that the motivation and governance extensions are incorporated into the Architecture Content Metamodel. Using these extensions will allow modeling the goals, objectives and drivers for the architecture, linking them to service levels and more detailed governance models. This will also enable the ability to re-use existing profiles, customizing them for the various service contracts involved.
- B. You recommend that a Communications Engineering view is created using the infrastructure consolidation extension from the Architecture Content Metamodel. This view will allow architects to align the needed performance measurement communications across the system. This will support the stringent performance measurements needed for the more detailed governance views required for the upgraded system, making the interfaces to the communication and network layer of the architecture highly visible at the application level.
- C. You recommend all of the extensions be incorporated into the Architecture Content Metamodel. The full Content Metamodel will enable the EA team to capture and categorize all the important additional data needed to support the performance and measurement objectives linked to these artifacts. Once the new repository content has been implemented, on-demand queries can be used to generate a customized governance stakeholder view that isolates the artifacts and data needed to assess measurement for any particular service. If this view is found to be inadequate for the governance concerns, the service models within those artifacts can be expanded.
- D. You recommend that the services extension be incorporated into the Architecture Content Metamodel. By using this extension, the service model is no longer constrained by what is expected in typical business service definitions, allowing more flexibility for adding customized models to support the more stringent measurement requirements. The services extension can also be used to map terminology between the business services and the application components.
Answer: D
Explanation:
Section: Part 2
NEW QUESTION # 141
Scenario:
Please read this scenario prior to answering the question
The ABC company specializes in the development of wind turbine blades for use in large-scale commercial wind energy production systems. The company has manufacturing facilities located in Palm Springs, California, Omaha, Nebraska, and Winnipeg, Manitoba. Each of these plants supplies a different manufacturer that builds and sells complete systems. The turbine blades are custom engineered to meet each manufacturer's design specifications.
Until recently, most turbine blades were fabricated manually using molded fiber-reinforced plastics.
However, recent improvements in composite materials, coupled with enhanced automated methods for precision application of materials during the molding process, have led to significant reduction in weight, increase in strength, and greatly improved blade longevity. The company has pioneered the development of a proprietary automated process for continuous extrusion of the turbine blades. Patents have been filed to protect the process, but certain trade secrets must be closely guarded.
The company has a mature Enterprise Architecture organization that is supported by a cross-functional Architecture Review Board. The Chief Information Officer and the Chief Operating Officer co-sponsor the Enterprise Architecture program.
The company has used T0GAF and its Architecture Development Method (ADM) to develop its automated manufacturing processes and systems that are used to design, manufacture, and test the blade assemblies. They have adapted their Enterprise Architecture to closely follow the TOGAF 9 framework. All of the company's enterprise architects have been trained and certified on TOGAF 9. Recently, an architecture project was completed that defined a standard approach for controlling the Automated Test System that is used at each plant to perform final quality assurance tests on each completed blade assembly. The Manufacturing Architecture Board approved the plan for immediate implementation at each plant.
An Architecture Contract was developed that detailed the work needed to implement and deploy the new Automated Test System controller. The Chief Engineer, sponsor of the activity, has expressed concern that a uniform process be employed at each site to ensure consistency.
Refer to the Scenario
You are the Lead Architect for this activity.
You have been asked to recommend the best approach to adopt to address the Chief Engineer's concern.
Based on TOGAF 9, which of the following is the best answer?
- A. You create an Architecture Contract to manage and govern the implementation and migration process.
If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
You recommend that if a deviation from the contract is detected, the Manufacturing Architecture Board should modify the Architecture Contract to allow the implementation organization the ability to customize the process to meet their local needs. As a result, you then issue a new Request for Architecture Work to implement the modified Architecture Definition. - B. You create an Architecture Contract to govern the implementation and migration process at each site.
If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. You ensure that the contract addresses the project objectives, effectiveness metrics, acceptance criteria, and risk management. You then schedule compliance reviews at key points in the implementation process to ensure that the work is proceeding in accordance with the Architecture Definition. Based on the results, you ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs. - C. You create an Architecture Contract to manage and govern the implementation and migration process.
If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
You recommend that if a deviation from the Architecture Contract is detected, the Manufacturing Architecture Board grant a dispensation ID allow the implementation organization the ability to customize the process to meet their local needs. - D. You create an Architecture Contract to manage and govern the implementation and migration process.
If the contract is issued to an external party, you ensure that it is a fully enforceable legal contract. For internal development projects, you decide it is adequate to utilize a memorandum of understanding between the Manufacturing Architecture Board and the implementation organization.
You ensure that the Manufacturing Architecture Board reviews all deviations from the Architecture Contract, and considers whether or not to grant a dispensation to allow the implementation organization to customize the process to meet their local needs.
Answer: B
Explanation:
Explanation/Reference:
Incorrect:
Not C: correct, but missing contract see 49.2.2..
Note:
* Dispensations
A dispensation is used as the mechanism to request a change to the existing architectures, contracts, principles, etc. outside of normal operating parameters; e.g., exclude provision of service to a subsidiary, request for unusual service levels for specific business reasons, deploy non-standard technology or products to support specific business initiatives.
Dispensations are granted for a given time period and set of identified services and operational criteria that must be enforced during the lifespan of the dispensation. Dispensations are not granted indefinitely, but are used as a mechanism to ensure that service levels and operational levels, etc. are met while providing a level flexibility in their implementation and timing. The timebound nature of dispensations ensures that they are a trigger to the Architecture Compliance activity.
NEW QUESTION # 142
Complete the sentence. The key purpose of Gap Analysis is to _____
- A. establish quality parameters for the architecture
- B. identify commercial building blocks to be purchased
- C. validate nonfunctional requirements
- D. determine the required service levels for the architecture
- E. identify potential missing or overlapping functions
Answer: E
Explanation:
Section: Part 2
NEW QUESTION # 143
Scenario
Please read this scenario prior to answering the question
Your role is that of the Lead Architect working for a government agency responsible for immigration, customs, and border control. The agency was formed by consolidating several smaller government agencies. The agency has established an Enterprise Architecture practice based on TOGAF 9. The CIO is the executive sponsor and has appointed an EA steering team to oversee the practice.
There has been a considerable increase in security requirements and immigration service requests in recent years, which have expanded the scope and size of the operations of the agency. As a result, the existing Information Technology architecture no longer meets the required service levels. A significant Enterprise Architecture (EA) initiative is in progress with the opal to improve customer responsiveness and satisfaction, and improve the overall operational efficiency of the agency.
The current EA staff members were internal appointments based on a request from the EA steering team to supply a number of suitable individuals for the EA effort. Collectively, they possess a broad range of IT and business analysis skills. However, the CIO has expressed concern about the diverse range of experience within the team. There is concern that the EA staff may be lacking in some of the critical skills that are required to properly conduct EA activities. It had been assumed that any EA-related skill gaps would be overcome by on-the-job mentoring from the senior members of the EA staff. Each architect was expected to attend a TOGAF training course and participate in other skill development activities.
A recent review of the EA program revealed that many EA staff members, despite attending multi-day training courses, were not proficient in analyzing or creating the models and artifacts required for their assigned architecture projects. Stakeholders have observed errors and inconsistencies in artifacts and deliverables being submitted for review.
Refer to the Scenario
The CIO has asked you to recommend a professional development plan for the EA staff in order to address the findings raised in the recent review.
Based on TOGAF, which of the following is the best answer?
- A. You recommend that an architecture maturity assessment should be conducted. This will identify the practices on which the agency should focus to see the greatest improvement and ensure that the basic enterprise architecture process is documented. As part of the assessment, all of the team leaders should be interviewed and their qualifications assessed. In order to rectify areas of low proficiency, they are expected to attend additional EA training courses. When the team leaders have achieved the desired levels of proficiency, they should apply a similar process for their staff members.
- B. You recommend that to address the issues identified in the review, the experienced team leaders should mentor the junior team members. At the same time additional training should be provided. Since it is now known that some models are improperly defined and may have caused cascading errors in other parts of the architecture, you recommend an iteration of the Migration Planning phase occur, so as to develop a coordinated transition to a new baseline using the last known good architecture. Once the artifacts are consistent and correct, these can be applied to this new baseline.
- C. You recommend that a comprehensive evaluation of key team leader skills be made using the TOGAF Architecture Skills Framework. Based on the evaluations, you will recommend the necessary staff changes.
This will ensure that the team leaders have the necessary skills and experience for the architecture tasks within the agency. The role and skill categories defined in the TOGAF Architecture Skills Framework should then be shared with the department leaders so that in the future, they can make more informed choices when providing internal candidates for the EA team. - D. You recommend that you work with the EA steering team to adapt the TOGAF Architecture Skills Framework for use within the architecture practice at the agency. The categories of architecture roles, the required skills for each role and the desired level of proficiency for each role and skill will be defined by this framework. Each team member, or prospective team member, can then be evaluated for suitability against these roles and skills. Staffing and training adjustments can then be made as necessary to close gaps that are discovered.
Answer: D
Explanation:
Section: Part 2
NEW QUESTION # 144
TOGAF uses a version numbering convention to illustrate the evolution of the Baseline and Target Architecture Definitions. Which version number in this convention indicates a high-level outline of the architecture?
- A. Version 0.1
- B. Version 0.5
- C. Version 1.5
- D. Version 1.0
- E. Version 0.9
Answer: A
NEW QUESTION # 145
Which of the following describes an objective of the Preliminary Phase?
- A. Develop the Architecture Vision document
- B. Establish the architecture governance processes
- C. Operate the governance framework
- D. Ensure conformance requirements for the target architecture are defined
- E. Develop the Implementation and Migration Plan
Answer: B
Explanation:
Section: Part 2
Explanation/Reference:
Reference https://pubs.opengroup.org/architecture/togaf91-doc/arch/chap06.html
NEW QUESTION # 146
According to TOGAF, which of the following is a characteristic of a Foundation Architecture?
- A. It includes a model of application components and application services software, including brokering applications
- B. It includes models for common high-level business functions, such as supply chain management
- C. It contains building blocks and their corresponding standards
- D. It contains business functions and processes specific to a particular industry sector
- E. It contains only solution building blocks
Answer: C
Explanation:
Section: Part 1
Explanation/Reference:
NEW QUESTION # 147
Which one of the following best describes the purpose of a Change Request?
- A. To request a dispensation or to kick-start a further cycle of architecture work
- B. To ensure that the results of a Compliance Assessment are distributed to the Architecture Board
- C. To ensure that information is communicated to the right stakeholder at the right time
- D. To review project progress and ensure the implementation is inline with the objectives
- E. To act as a deliverable container for artifacts created during a project
Answer: A
Explanation:
Section: Part 1
Explanation/Reference: https://books.google.com.pk/books?id=e19eAgAAQBAJ&pg=PA174&lpg=PA174&dq=togaf+9
+change+request+To+request+a+dispensation+or+to+kick-start+a+further+cycle+of+architecture
+work&source=bl&ots=THcMNzDaWa&sig=ACfU3U22CWhlkyjhrUjm_XYQ2Ydt0d1ZmA&hl=en&sa=X&ved=2 ahUKEwiYg564j4ngAhUMD2MBHbMtD9gQ6AEwAXoECAEQAQ#v=onepage&q=togaf%209%20change%
20request%20To%20request%20a%20dispensation%20or%20to%20kick-start%20a%20further%20cycle%
20of%20architecture%20work&f=false
NEW QUESTION # 148
Scenario
Please read this scenario prior to answering the question
Your role is that of the Lead Architect working for a government agency responsible for immigration, customs, and border control. The agency was formed by consolidating several smaller government agencies.
The agency has established an Enterprise Architecture practice based on TOGAF 9. The CIO is the executive sponsor and has appointed an EA steering team to oversee the practice.
There has been a considerable increase in security requirements and immigration service requests in recent years, which have expanded the scope and size of the operations of the agency. As a result, the existing Information Technology architecture no longer meets the required service levels. A significant Enterprise Architecture (EA) initiative is in progress with the opal to improve customer responsiveness and satisfaction, and improve the overall operational efficiency of the agency.
The current EA staff members were internal appointments based on a request from the EA steering team to supply a number of suitable individuals for the EA effort. Collectively, they possess a broad range of IT and business analysis skills. However, the CIO has expressed concern about the diverse range of experience within the team. There is concern that the EA staff may be lacking in some of the critical skills that are required to properly conduct EA activities. It had been assumed that any EA-related skill gaps would be overcome by on-the-job mentoring from the senior members of the EA staff. Each architect was expected to attend a TOGAF training course and participate in other skill development activities.
A recent review of the EA program revealed that many EA staff members, despite attending multi-day training courses, were not proficient in analyzing or creating the models and artifacts required for their assigned architecture projects. Stakeholders have observed errors and inconsistencies in artifacts and deliverables being submitted for review.
Refer to the Scenario
The CIO has asked you to recommend a professional development plan for the EA staff in order to address the findings raised in the recent review.
Based on TOGAF, which of the following is the best answer?
- A. You recommend that an architecture maturity assessment should be conducted. This will identify the practices on which the agency should focus to see the greatest improvement and ensure that the basic enterprise architecture process is documented. As part of the assessment, all of the team leaders should be interviewed and their qualifications assessed. In order to rectify areas of low proficiency, they are expected to attend additional EA training courses. When the team leaders have achieved the desired levels of proficiency, they should apply a similar process for their staff members.
- B. You recommend that to address the issues identified in the review, the experienced team leaders should mentor the junior team members. At the same time additional training should be provided. Since it is now known that some models are improperly defined and may have caused cascading errors in other parts of the architecture, you recommend an iteration of the Migration Planning phase occur, so as to develop a coordinated transition to a new baseline using the last known good architecture. Once the artifacts are consistent and correct, these can be applied to this new baseline.
- C. You recommend that a comprehensive evaluation of key team leader skills be made using the TOGAF Architecture Skills Framework. Based on the evaluations, you will recommend the necessary staff changes. This will ensure that the team leaders have the necessary skills and experience for the architecture tasks within the agency. The role and skill categories defined in the TOGAF Architecture Skills Framework should then be shared with the department leaders so that in the future, they can make more informed choices when providing internal candidates for the EA team.
- D. You recommend that you work with the EA steering team to adapt the TOGAF Architecture Skills Framework for use within the architecture practice at the agency. The categories of architecture roles, the required skills for each role and the desired level of proficiency for each role and skill will be defined by this framework. Each team member, or prospective team member, can then be evaluated for suitability against these roles and skills. Staffing and training adjustments can then be made as necessary to close gaps that are discovered.
Answer: D
NEW QUESTION # 149
Which of the following is a responsibility of an Architecture Board?
- A. Achieving consistency between sub-architectures
- B. Determining the scope of an architecture compliance view
- C. Conducting assessments of the maturity level of architecture discipline within the organization
- D. Allocating resources for architecture projects
- E. Creating the Statement of Architecture Work
Answer: C
NEW QUESTION # 150
Complete the sentence. All of the following describe a purpose of an Architecture Compliance review, except
______________.
- A. ensuring the application of best practices
- B. identifying where architecture standards require modification
- C. identifying business transformation risks for an architecture project
- D. identifying errors in an architecture project
- E. determining the technical readiness of a project
Answer: C
NEW QUESTION # 151
Which of the following does the TOGAF document define as the representation of a related set of concerns?
- A. Viewpoint
- B. Matrix
- C. View
- D. Diagram
- E. Catalog
Answer: C
NEW QUESTION # 152
Which phase of the ADM establishes a set of Principles?
- A. Phase H
- B. Phase A
- C. Preliminary Phase
- D. Phase D
- E. Phase G
Answer: C
NEW QUESTION # 153
TOGAF Part VII, Architecture Capability Framework recommends use of an ADM cycle for establishing an architecture practice. In this scenario which architecture would describe the organizational structure for the architecture practice?
- A. Business Architecture
- B. Data Architecture
- C. Application Architecture
- D. Technology Architecture
Answer: A
NEW QUESTION # 154
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Enterprise Architect at a major supplier in the automotive industry. The company is headquartered in Cleveland, Ohio with manufacturing plants across the United States, Brazil, Germany, Japan and South Korea. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.
The company is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff.
The Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9.
At a recent meeting, the Architecture Board approved a Request for Architecture Work sponsored by the Chief Engineer of Global Manufacturing Operations. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation.
The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of diving their planning and production scheduling from a remote centralized system. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Scenario
During the initial meeting of the Common ERP Deployment architecture project team, a number of alternative recommendations for how to proceed are put forward by members of the team.
You have been asked to select the most appropriate recommendation to ensure that the team evaluates different approaches to the problem and clarifies the requirements for the architecture.
Based on TOGAF 9, which of the following is the best answer?
- A. The team should conduct a pilot project that will enable vendors on the short list to demonstrate potential solutions that will address the concerns of the stakeholders. Based on the findings of that pilot project, a complete set of retirements will be developed that will drive the evolution of the architecture.
- B. The team should develop Baseline and Target Architectures for each of the manufacturing plants, ensuring that the views corresponding to selected viewpoints address key concerns of the stakeholders. A consolidated gap analysis between the architectures will then be used to validate the approach, and determine the capability increments needed to achieve the target state.
- C. The team should exercise due diligence and carefully research vendor literature and conduct a series of briefings with vendors that are on the current approved supplier list. Based on the findings from the research, the team should define a preliminary Architecture Vision. The team should then use that model to build consensus among the key stakeholders.
- D. The team should use stakeholder analysis to understand who has concerns about the initiative. The team should then hold a series of interviews at each of the manufacturing plants using the business scenario technique. This will then enable them to identify and document the key high-level stakeholder requirements for the architecture.
Answer: B
Explanation:
Section: Part 2
NEW QUESTION # 155
Which part of the TOGAF document describes taxonomies for categorizing the outputs of architecture activity?
- A. Enterprise Continuum & Tools
- B. Architecture Development Method
- C. Architecture Capability Framework
- D. ADM Guidelines and Techniques
Answer: A
Explanation:
Section: Part 1
NEW QUESTION # 156
Which of the following statements best describes the Requirements Management process?
- A. The development of requirements that deliver business value
- B. The prioritization and disposal of architecture requirements
- C. The review of business requirements within the TOGAF ADM
- D. The management of architecture requirements throughput the ADM cycle
- E. The development of requirements for ADM Phase A
Answer: D
Explanation:
Explanation/Reference:
Reference: http://pubs.opengroup.org/architecture/togaf8-doc/arch/chap15.html
NEW QUESTION # 157
Which of the following describes a key objective of the Technology Architecture Phase?
- A. To define the Transition Architectures needed to achieve the Target Architecture
- B. To develop a migration plan to deliver incremental capabilities
- C. To define the solution architecture needed to support the Application Architecture
- D. To select a set of technology products that will form the basis of a solution architecture
- E. To define technology components into a set of technology platforms
Answer: E
NEW QUESTION # 158
In which ADM phase is the goal to ensure that the architecture achieves its original target business value?
- A. Phase E
- B. Phase H
- C. Preliminary Phase
- D. Phase F
- E. Phase G
Answer: B
NEW QUESTION # 159
Within the Architecture Continuum, which of the following consists of generic components inter-relationships principles and guidelines?
- A. Industry Architecture
- B. Common Systems Architecture
- C. Foundation Architecture
- D. Organization-Specific Architecture
- E. Transition Architecture
Answer: D
NEW QUESTION # 160
......
Latest OG0-093 Pass Guaranteed Exam Dumps Certification Sample Questions: https://www.braindumpspass.com/TheOpenGroup/OG0-093-practice-exam-dumps.html
OG0-093 Updated Exam Dumps [2023] Practice Valid Exam Dumps Question: https://drive.google.com/open?id=1JuxYe6pnVDNWmZpPTHwZowgKg2B7xekc