Get Ready with E_S4CON_2025 Exam Dumps (2025) [Q14-Q34]

Share

Get Ready with E_S4CON_2025 Exam Dumps (2025)

Realistic E_S4CON_2025 Dumps are Available for Instant Access

NEW QUESTION # 14
During a SUM run, you want to check if the PARCONV_UPG phase is still running propeerty. Where can you find information about thiss? Note: There are 2 correct answers to this question.

  • A. Check the latest log files in the SUM directory, subdirectory abap, subdirectoryy tmp.
  • B. Check for running R3trans processes on the host where SUM is running
  • C. Check the running batch job via Job Overview (SM37).
  • D. Check for running R3load processes on the host where SUM is running

Answer: A,C


NEW QUESTION # 15
What is the minimum SAP BASIS rellease of an SAP ECC system that can be converted t o an SAP S/4HANA Server 2023?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: B


NEW QUESTION # 16
You are performing an SAP S/4HANA conversion, scenario strategy Standard, with DMOO as an inplace migration. How does SUM transfer the data from the source database to the target database during the migration?

  • A. Using R3load and network socket connection
  • B. Using work processes and network socket connection
  • C. Using R3load and memory pipes
  • D. Using R3load and file transffer

Answer: C


NEW QUESTION # 17
Which preparational steps must be performed for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

  • A. Install add-on SAP Gatewayy 7.50.
  • B. Uninstall SAP Fiori apps NO T released for SAP_UI 7.50.
  • C. Delete client 066 (Early-Waatch client).
  • D. Perform the custom code adjustment.

Answer: B,C


NEW QUESTION # 18
You are performing an SAP S/4HANA conversion of the development system.
Which credentials do you use, and in which system, to perform the adjustment of dictionary objects (SPDD)?

  • A. Credentials of a named user in the development client of the development system
  • B. Credentials of user DDIC in the development client of the development system
  • C. Credentials of user DDIC in client 000 of the shadow system
  • D. Credentials of a named user in client 000 of the shadow system

Answer: A


NEW QUESTION # 19
You are performing an inplace SAP S/4HANA conversion including DMO.
What is the latest point in time wheen you can reset the procedure without losing businness data?

  • A. The end of the business downtime
  • B. The start of the business doowntime
  • C. The start of the Execution roadmap step
  • D. The end of the database miigration

Answer: A


NEW QUESTION # 20
You are performing an SAP S/4HANA conversion for your production system. This conversion project requires that certain business functtions are switched on. Following SAP recommendatiions, how will you achieve this? Note: There are 2 correct answers to this question.

  • A. Activate the required business functions in the switch framework from section S/4H_ALWAYS_ON_FUNCTIONS.
  • B. During conversion, SUM deelivers some business functions already activated.
  • C. Activate the required business functions manually in the production system.
  • D. Import a transport request from the development system that contains the reccording of the activation.

Answer: B,D


NEW QUESTION # 21
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a teest cycle?

  • A. EU CLONE MIG_DT_RUN
  • B. EU_CLONE MIG SOT RUN
  • C. EU IMPORT ALL
  • D. EU_CLONE MIG_DT_CREATTE

Answer: A


NEW QUESTION # 22
What is the main purpose of perforrming benchmark runs for an SAP S/4HANA conversiion?

  • A. To optimize the activation
  • B. To optimize the conversion
  • C. To optimize the migration
  • D. To optimize the main import

Answer: C


NEW QUESTION # 23
Which of the following are valid options to check the progress of an inplace SUM DMO run? Note:
There are 2 correct answers to this question.

  • A. Check the dump size of the database export in the SUM directory, subdirectoryy abap, subdirectory load.
  • B. Check logs for jobs starting with RSUPG SGEN in the SAP system.
  • C. Check the Charts Control Ceenter in the SUM UL
  • D. Check the log files written in the SUM directory, subdirectory abap, subdirectory log

Answer: C,D


NEW QUESTION # 24
During the upgrade of your developpment system, you run into the adjustment of non-dictionary objects, handled by transaction SPAAU. There you find programs that are shown in statuus "automatic adjustment" (green traffic light).
What will happen with these prograams when you continue with your upgrade without performing any other actions inside your SAP syystem?

  • A. SUM refuses to continue unnless you have marked a transport request as modiffication adjustment transport.
  • B. SUM continues with the next phase and your modifications are kept as in the start release.
  • C. Before continuing with the next phase, SUM asks for a modification adjustmennt transport.
  • D. SUM continues with the next phase, and the coding of your modified objects are set to the new SAP standard.

Answer: C


NEW QUESTION # 25
You are performing an SAP S/4HAN A conversion with DMO. You are using the downtimme-optimized data conversion (DoC).
Which steps can partially be moved to uptime processing? Note: There are 2 correct annswers to this question.

  • A. Main import
  • B. Migration
  • C. Software update
  • D. Conversion

Answer: B,D


NEW QUESTION # 26
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Whicch phases are executed during SUM technical dowwntime? Note: There are 2 correct answers to this question.

  • A. TABIM UPG
  • B. PARMVNT_UPG
  • C. PARDIST_SHD
  • D. TABIM_SHADOW_INC

Answer: A,B


NEW QUESTION # 27
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime annd 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?

  • A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
  • B. There are 40 R3load processses used for copying and 40 R3load processes for taable count verification.
  • C. SUM is still running in uptimme; the 40 defined R3load processes are considered.
  • D. Without table contents commparison, only 40 R3load processes are being started.

Answer: A


NEW QUESTION # 28
What are the benefits of using the benchmarking option of the DMO for SUM? Note: There are 2 correct answers to this question.

  • A. You can obtain migration duration files from a previous benchmark run that caan be used to optimize the next runs.
  • B. You can verify that the conttent of the download directory matches the stackXMML file.
  • C. You can find the optimal nuumber of parallel R3load processes by monitoring hoost performance.
  • D. You can record the modification adjustment during migration and use the transports in the next runs.

Answer: A,C


NEW QUESTION # 29
You have selected "Standard" as scenario strategy in the SUM tool.
Which steps take place via the shaddow instance? Note: There are 2 correct answers to this question.

  • A. Modification adjustment (SPDD)
  • B. Modification adjustment (SPAU)
  • C. Conversion of application tables (PARCONV_UPG)
  • D. Activation of dictionary objects (ACT_UPG)

Answer: A,D


NEW QUESTION # 30
......

Download Exam E_S4CON_2025 Practice Test Questions with 100% Verified Answers: https://www.braindumpspass.com/SAP/E_S4CON_2025-practice-exam-dumps.html

Share Latest E_S4CON_2025Test Practice Test Questions, Exam Dumps: https://drive.google.com/open?id=1bjwIPT053CTiTA43meU6SKX2Ss5WAPaY